New Kitchen: End of Day One

Day one of the great Kitchen Rejuvination and lots of noise as the kitchen fitters ripped out the old kitchen units etc.

In so doing they found no less then three different layers of flooring, which explains why the back door ‘dragged’ and the floor level was a good 1.5 inches higher than parquet in the hallway. But underneath it all was a rather nice herringbone pattern quarry tile floor. True it needs some repair in one section but if we can get matching tiles it will look rather good!
Yes its still covered in guck – but no cleaning until after the plasterers have been.

 

day 1 c

day 1 b

Then there are the walls – which in places had three layers of tiles stick on top of each other.  Note – the multiple floor coverings had trapped damp – hence a rather dark patch in the corner. Bleach to the ready!

In places the remanants of multiple layers of paper – most painted over, but the remains of one funky 70s style horror  is still in evidence.

 

Our old kitchen now lays in ruins in the back yard awaiting the tip!.

 

 

Cats hate noise and our three reacted in typical fashion. Oberon and Betty Poop retreated to the back bedroom. Miss Dilly, of course, was on the case, running to the top of the stairs to peer down in the direction of all the racket and then running back to me to tell me there are noisy people inthe house and would I kindly tell them to shut up!

It is quiet now and instead of a kicten we have an empty space.

And our treat for tomorrow?

The Electrician cometh!!

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s